Where does the Nashua Rail Trail start?
The Nashua River Rail Trail stretches from southern Nashua, New Hampshire, to downtown Ayer, Massachusetts, connecting to the towns of Pepperell and Groton. The trail is built on the former rail corridor of the Hollis Branch of the Boston and Maine Railroad. The last freight line to run on the rails was in 1982.
How long is the Nashua River trail?
11 miles
The Nashua River Rail Trail is a former railroad right of way that travels 11 miles through the towns of Ayer, Groton, Pepperell and Dunstable. Fishing, mountain biking and hiking. Walking trails.
Is the Nashua Rail Trail open?
The trail is open year-round and is beautiful to visit anytime. Dogs are welcome, but must be on a leash. The Nashua River Rail Trail is a 12-mile trail connecting Ayer, MA to Nashua, NH.
Where do you park for the Nashua River Rail Trail?
Parking areas for access to the trail are located in Ayer, Groton, and Dunstable.
- Ayer Center parking lot.
- Groton Center parking (Court Street 10-15 spaces)
- Groton Sand Hill Road parking (10-15 gravel spaces)
- Dunstable state line parking (10 gravel spaces)
How long is the Cochituate Rail Trail?
4 mile
The Cochituate Rail Trail is a beautifully-designed and functional 4 mile shared use path, connecting Natick’s vibrant downtown with the Natick Mall and Golden Triangle, crossing Routes 9 and 30 to connect to Framingham’s already completed portion that ends in Saxonville Village.
Where do I park for Windham Rail Trail?
Although available, parking is limited at Roulston Rd. Combined, the Windham and Derry Rail Trails provide for 8 miles of a continuous paved rail trail. The Windham Junction Kitchen is located about 100 yds from the Depot at the corner of Depot and North Lowell Roads.
Is Cochituate Rail Trail open?
Construction and Project Updates – 11/29/2021 The Cochituate Rail Trail is open to the public, with a few remaining construction items, including improvements to the connecting path at Route 9 westbound.
How long is the Framingham Rail trail?
The 3.5-mile Framingham segment of the proposed 25-mile trail runs right through many of Nobscot’s most populated neigh- borhoods. When completed, more than 1,000 residents will be within a 5-minute walk/bike of the trail.
Where does the Windham rail trail start?
Windham Depot trailhead
Parking and Trail Access To reach the Windham Depot trailhead from I-93 N, take Exit 3 onto SR 111 W toward Windham. Head west 1.6 miles, and turn right onto N. Lowell Road. Go 2.6 miles, and turn right onto Depot Road.
How long is Windham rail trail?
Combined, the Windham and Derry Rail Trails provide for 8 miles of a continuous paved rail trail. The Windham Junction Kitchen is located about 100 yds from the Depot at the corner of Depot and North Lowell Roads.
How long is Cochituate Rail Trail?
How long is the Cochituate Brook Reservation Trail?
4 miles
The Cochituate Rail Trail (CRT) is a multi-use trail that will run from the Village of Saxonville in Framingham to Natick Center, a distance of 4 miles.
Where does the Bruce Freeman Rail Trail end?
Westford
Overview. The Bruce Freeman Rail Trail extends from the Lowell/Chelmsford line near Cross Point and Rt. 3, through Chelmsford Center, to the intersection of Route 27 and Route 225 in Westford.
How long is the NH rail trail?
59 miles
Activities and Amenities. This 48- mile trail is the longest rail trail under our management; its ultimate length will be 59 miles. It begins at Webster Place off Route 3 in Franklin and ends at Spencer Street in Lebanon.
Where does the Natick Rail trail start?
The entire path, once complete, will run 4 miles from Saxonville to Natick Center, starting on Concord Street in Framingham, dipping under the Mass Pike, narrowly passing across Lake Cochituate, Route 9 and to the commuter rail station in Natick Center.
How long is the Danvers Rail Trail?
4 1/3-mile
The Danvers Rail Trail is a 4 1/3-mile non-motorized shared-use path linking schools, downtown Danvers, parks, residential areas, and trails in the neighboring towns of Peabody, Wenham, and Topsfield.
Is the Northern Rail Trail in New Hampshire paved?
Excellent Trail from Downtown Lebanon There is plenty of free, paved parking at the start in downtown Lebanon, NH. The trail is hard-packed and well maintained. The ride is very scenic, through woods along the Mascoma River and Mascoma Lake, for the first eight miles out to the old Enfield train station.
How long is Goffstown rail trail?
about 5.5 miles
How long is the trail? It is about 5.5 miles from the western end in Goffstown village to the Manchester city line.
How long is the Topsfield Rail Trail?
The trail utilizes the abandoned railroad bed of the Newburyport Branch Rail line that operated from 1854-1950. The Linear Common is 4 miles in length, extending from the Wenham town line through the center of Topsfield to the Boxford town line.
How long is the Newburyport Rail Trail?
3.3 miles
The Clipper City Rail Trail (3.3 miles, paved) connects the MBTA commuter rail station to the Harborwalk along the waterfront. A newer section follows the bank of the Merrimack River to Water Street and connects through the South End under High Street to Parker Street in Newbury.