What does fac stand for NERC?
Filed with FERC: June 28, 2021. Background. Facilities Design, Connections, and Maintenance (FAC) standards fulfill an important reliability objective for determining and communicating System Operating Limits (SOLs) used in the reliable planning and operation of the Bulk Electric System (BES).
What is a NERC RSAW?
A Reliability Standard Audit Worksheet (RSAW) is a guide provided by the Electric Reliability Organization (ERO) that describes types of evidence registered entities may use to demonstrate compliance with a Reliability Standard. RSAWs also include information regarding how the ERO may assess that evidence.
What is a facility rating FAC 008?
Purpose. To ensure that Facility Ratings used in the reliable planning and operation of the Bulk Electric System (BES) are determined based on technically sound principles. A Facility Rating is essential for the determination of System Operating Limits.
What is fac008?
FAC-008-4. 3. Purpose: To ensure that Facility Ratings used in the reliable planning and. operation of the Bulk Electric System (BES) are determined based on technically sound principles.
Who is subject to NERC standards?
NERC works closely with eight regional reliability organizations whose members come from all segments of the electric industry: investor-owned utilities; federal power agencies; rural electric cooperatives; state, municipal and provincial utilities; independent power producers; power marketers; and end-use customers.
What is a facility rating?
Facility Rating means the output potential the Facility can produce under specified conditions, which is generally expressed in kW-AC or MW-AC.
Who is regulated by NERC?
NERC is the Electric Reliability Organization (ERO) for North America, subject to oversight by the Federal Energy Regulatory Commission (FERC) and governmental authorities in Canada. NERC’s jurisdiction includes users, owners, and operators of the bulk power system, which serves nearly 400 million people.
What does type of facility mean?
Types of facilities include overdraft services, deferred payment plans, lines of credit (LOC), revolving credit, term loans, letters of credit, and swingline loans. A facility is essentially another name for a loan taken out by a company.
Who is subject to NERC?
What are NERC regions?
NERC oversees six regional reliability entities and encompasses all the interconnected power systems of Canada and the contiguous United States, as well as a portion of Mexico.
Who will comply with NERC CIP?
The NERC CIP standards require utility companies in North America to establish and adhere to a baseline set of cybersecurity measures. The goal is to ensure that appropriate security controls are in place to protect BES and its users and customers from all threats that may affect its timely and effective functioning.
Who does NERC CIP apply?
The NERC is the federal entity responsible for the oversight of the Bulk Electric System (BES) for North America. Its jurisdiction applies to all owners, users, producers, and suppliers of the Bulk Electric Supply in eight provinces of Canada, one state in Mexico and all of the continental United States.
What are NERC CIP requirements?
What does RSAW stand for?
Reliability Standard Audit Worksheets (RSAWs) Rich HTML Content 1 Reliability Standard Audits Worksheets Type Number Title Date Header: Archived RSAWs (6) 2011 Complete Set Reliability Standard Audit Worksheet – Complete Set for 2011 Actively Monitored List 1/25/2011 2012 Complete Set
What are the fac-003-4 and fac-008-5 ratings?
FAC-003-4 Transmission Vegetation Management 7/22/2016 FAC-008-5 Facility Ratings 9/20/2021 FAC-010-2.1 System Operating Limits Methodology for the Planning Horizon v2 1/25/2011 FAC-010-3 System Operating Limits Methodology for the Planning Horizon 12/19/2016 FAC-011-2 System Operating Limits Methodology for the Operations Horizon 1/25/2011
What is the PRC code for underfrequency load shedding?
PRC-005-2(i) Protection System Maintenance 5/16/2016 PRC-005-6 Protection System, Automatic Reclosing, and Sudden Pressure Relaying Maintenance 5/16/2016 PRC-006-3 Automatic Underfrequency Load Shedding 11/29/2017 PRC-006-5 Automatic Underfrequency Load Shedding 3/18/2021 PRC-008-0 Underfrequency Load Shedding Equipment Maintenance Programs
What are the prc-001-002-2 and PRC–004-4 (I) regulations?
PRC-001-1.1(ii) System Protection Coordination 8/5/2015 PRC-002-2 Disturbance Monitoring and Reporting Requirements 2/19/2016 PRC-004-4(i) Protection System Misoperation Identification and Correction 3/31/2016 PRC-004-5(i) Protection System Misoperation Identification and Correction 11/3/2016 PRC-004-6