What building code does Toronto use?
Ontario Building Code is a regulation under the Building Code Act. It establishes detailed technical and administrative requirements. and minimum standards for building construction. .
How far does a shed have to be from the property line Toronto?
All accessory buildings in the side yard require a side yard setback of not less than the minimum required for the main building. 0.5m from the rear lot line but no closer than 7.5m from the opposite boundary of the lane. Overhang projections (i.e. soffits and eavestroughs) are required to be 0.15m from property lines.
What is the largest structure you can build in Ontario without a permit?
You must obtain a building permit before you: construct any new building over ten square meters in area or place another structure, such as a mobile home, on your property.
How do I find my Ontario Building Code?
The Code and Construction Guide for Housing based on 2012 Building Code Compendium December 16, 2020 update can be purchased online from the Code and Construction Guide for Housing product page.
What is the current version of Ontario building code?
May 2, 2019 The ministry amended Ontario’s Building Code (O. Reg 332/12) to further harmonize Ontario’s Building Code with the 2015 National Codes.
How close to your property line can you build Ontario?
Within the R1. 5, R2 and R3 zoning districts, the interior side yard setback for detached accessory structures shall be 5 FT for structures located within 75 FT of the front property line and 3 FT for structures located greater than 75 FT from the front property line.
How big can you build a shed in Toronto?
The Ontario Building Code was recently changed to allow for sheds up to 160 square feet to be built WITHOUT a building permit. Any structure larger than 160 square feet requires a building permit. For structures over 160 square feet, we will handle the permit process for you.
Is Ontario Building Code available online?
What is the latest version of the Ontario Building Code?
What is the most recent Building Code?
ICC IBC-2021
IBC Development The International Code Council (ICC) promulgates a new International Building Code every 3 years through the ICC Code Development Process. As such, the current version of the IBC is the 2021 edition, also known as ICC IBC-2021.
Do you need a permit to build a deck in Ontario?
Do I need a permit to construct a deck or porch? Generally, a Building Permit is required for a deck or porch that is attached to the principal dwelling or used in conjunction with an on-ground or above-ground swimming pool.
What is the newest version of the Ontario Building Code?